vareo
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/bq99mrtr4boi/gvc/wp-includes/functions.php on line 6121Concentrating solar power (CSP) represents a clean, powerful, endless, and reliable source of energy with the capacity to entirely satisfy the present and future electricity needs in the U.S. The new market for concentrating solar power plants has potential to create numerous U.S. manufacturing and construction jobs as U.S. companies grow and foreign firms come to the United States. This report was the fourth chapter in a series on Manufacturing Climate Solutions written by the Duke GVC Center for the Environmental Defense Fund (EDF).
View Report